November 19th Technical Meeting - Fire Stopping Mass Timber Buildings
November 19, 2024
5:30 PM - 8:30 PM
Burnaby Palace Restaurant
3110 Boundary Road
Burnaby, BC V5M 4A2
Venue website
Directions
Meeting Agenda:
5.30 pm: Sign in
6.00 pm: Appetizer served and networking
6:30 pm: Business updates, Introduction and Dinner Served
7.00 pm: Technical Session Begins
8.00 pm: Meeting Adjourns and Socializing till 8.30 pm
Presenters:
Luke Kong, P.Eng, PE, CP and Taishi Ito, B.Eng, EIT
Biography:
Luke Kong is a Professional Engineer and a Certified Professional he is a graduate of the engineering physics program and hold a bachelor of applied science from UBC. Luke possesses five years of fire testing and certification experience with building materials and assemblies from an accredited international laboratory. Luke assists with the implementation of performance based fire engineering, the development of alternate solutions, and the building code compliance.
Taishi Ito is an engineer in training as a member of the Engineers and Geoscientists BC. He holds a bachelor of engineering in mechanical engineering from the University of Alberta. Taishi assists with the implementation of performance based for engineering analysis and building code compliance and shop drawing reviews
Description: Luke Kong and Taishi Ito will present on the unique aspects of firestopping of mass timber. The presentation will discuss the construction requirements of encapsulated mass timber buildings under the updated BC Building Code 2024, and common approaches to firestopping of through penetrations in mass timber assemblies. GHL has been involved in the development of mass timber construction, starting with UBC Tall Wood in 2016, through many of the Code Changes and is currently involved in the majority of the large mass timber buildings under construction in BC. Mass Timber brings reliability of firestopping but with the impact of char, there are added and new complexities. Luke Kong brings with him experience working for Intertek before joining GHL four years ago. Luke is currently working on major mass timber projects, including 2150 Keith Drive on Great Northern Way near the VCC Clark Station.



Tickets
$50.00 Member
$40.00 Earlybird rate before November 17
$60.00 Guest (Non-Member)
$50.00 Earlybird rate before November 17
$15.00 Student Member
$10.00 Earlybird rate before November 17
$20.00 Student (Non-Member)
$15.00 Earlybird rate before November 17